Assorted views of new floor ribs

View of new hull plates, new ribs and floor support bars. The whitish colour on the steel in the picture shows the original level of the concrete ballast. Cast into the concrete was overĀ  3 tons of 25kg lead ingots.

New floor ribs in saloon area with fuel tank in the far end.

Inside view of new hull plating on starboard side ahead of diesel tank.

Same new piece of plating viewed from top of diesel tank.

New floor ribs in forward head/shower.

         
       

Base of new main mast support post.

       
         
back to index       View next folder